July’13 –
November’13
Ericsson/AT&T-Atlanta,
GA.
Construction Manager II
- I worked on the ATT LTE
project that required me to manage an ASP, create an inventory, and
supply the ASP with the necessary equipment to install the radio and
dish equipment to the cell towers. I was also responsible for
reviewing and submitting COP’s, and all other necessary documents
required by ATT and Ericsson. Dishes ranged from 4-8 feet.
January’13 –
July’13
Ericsson/Metro PCS-Atlanta,
GA.
Project Manager
- I worked on the Metro
PCS Mini-Link microwave project. I was the project manager of several
ASP’s, and oversaw the build of 350+ cell tower site link.
June’12 –
January’13
Ericsson/Comcast-Manassa,
VA.
Construction Manager
- I worked on the Comcast
Xfinity project verifying telephone poles and LOS for the installation
of Xfinity Wifi equipment.
November’10 –
June’12
Self-Employed-Jasper, GA.
Telecommunications
Engineer
- I continued working
AT&T projects (GPON, FTTCS, VRAD, and manhole proofing) for
different vendors. Engineering design of aerial strand, utility
verification, direct buried cable and underground facilities. Permit
designs.
September’07 –
November’10
CCLD Technologies-Buford,
GA.
Telecommunications
Engineer
- I worked on the MET^2,
VRAD and manhole proofing projects for AT&T in South Florida and
Broward areas, along with Florida Power & Light Co Fibernet cable
design. Design aerial fiber placement including additional strand,
buried cable design with Plan & Profile, permitting, underground
conduit design.
August ’05 –
August’07 Carvallo
International Trading
Svcs.-
Port Everglades,
FL.
Traffic Manager
- I was in charge of all
of the incoming and outgoing shipments; and also responsible for
creating customs documentation for any merchandise being transported
in and out of the country.
July ’04 –
August ’05
Unlimited Construction-Fort Lauderdale,
FL.
Construction
- I was apart of the
demolition team that was contracted to demolish and remodel the
majority of Winn Dixie’s in South Florida.
May ’01 – June
’04
National Check Trust Inc.-Miramar,
FL.
Supervisor
- I was the overnight
supervisor of 10 -15 employees, I also was responsible for processing
checks and verifying the check writers information. I also had to
analyze and print daily progress reports.
August ’00 –
March ’01 Norwegian
Cruise Lines-Miami,
FL.
Reservations
- I was a reservationist
and for my first four months I was the top reservation booker for my
team.
|
|
|
Beacon Tack, CAMTool, and other Ericsson and ATT programs
AutoCAD, MicroStation BSTCAD, Microsoft Office (Word, Excel, Power
point, Outlook). Adobe Acrobat, Google Earth, Photoshop,
OSP Engineering Design (aerial, buried, underground, site
development).
|